VALCHEDRAM SOLAR PARK (1870kWp)
FULLY OPERATIONAL FROM 29.08.2011

The site was assigned by Helios Power for construction of a solar generator after a detailed preliminary study conducted by Helios Power’s reported and certified consultants, the Central Lab of Solar Energy and New Energy Sources in the Bulgarian Academy of Sciences (CLSENES at BAS).

The site is situated in the industrial area of the small village of Valchedram, N-W Bulgaria. It is flat, perfectly oriented to North-South direction, with existing independent infrastructure, road communication and entrance access available.

Size of the plot is 4,0 ha, fully owned by the SPV Solar Valchedram EOOD.

The location is at Lat. 43°41' 54" N, Long. 23°26' 04" E; Altitude 60 m, NW Bulgaria.

Grid connection: Prescribed at the point of existing traf in the plot. Infrastructure + 0,4/20kV traf and a private 20kV power grid line available.

TECHNICAL EQUIPMENT PROVIDER
Mitsubishi International Corporation (www.mitsubishicorp.com)

PV Module Type - CSUN 230-60P (www.csun-solar.com), produced by CEEG Nanjing Renewable Co. Ltd. (www.ceeg.cn).

Inverter - String Inverters Sunny Tripower 15000TL/17000TL, produced by SMA Solar Technology AG (www.sma.de).

Support Structure – Fixed Type – produced by Ellon (www.ellon.eu).

Project Financing - Under a long term bank loan facility.