Projects


VALCHEDRAM SOLAR PARK (1,820MWp).GRIDOPERATOR CEZ
FULLY OPERATIONAL FROM 29.08.2011

The site was assigned by Helios Power for construction of a solar generator after a detailed preliminary study conducted by Helios Power’s reported and certified consultants, the Central Lab of Solar Energy and New Energy Sources in the Bulgarian Academy of Sciences (CLSENES at BAS).

The site is situated in the industrial area of the small village of Valchedram, N-W Bulgaria. It is flat, perfectly oriented to North-South direction, with existing independent infrastructure, road communication and entrance access available.

Size of the plot is 4,0 he, fully owned by the SPV Solar Valchedram EOOD.

The location is at Lat. 43°27ʹ N, Long. 23°11ʹ E; elevation 192 m; NW Bulgaria.

Grid connectionPrescribed at the point of existing traf in the plot. Infrastructure + 0,4/20kV traf and a private 20kV power grid line available.

VALCHEDRAM SOLAR PARK
Operational from August 29, 2011
1. General Information:
Total Installed Capacity KWp 1820
Feed-in Tariff for 1 MW/h EUR 357,45 SEWRC (ДКЕВР) № Ц-18/20.06.2011
Electricity Buy Out Term Years 20 According RES ACT, Official Gazzette N. 35/03.05.2011
1 Year Production and Income Statistics - September 2011 to August 2012
Sept.2011 Oct.2011 Nov.2011 Dec.2011 Jan.2012 Feb.2012 Mar.2012 Apr.2012 May2012 June2012 July 2012 Aug.2012 Total
Forecast for production
(KWh/month/1MWp)
120 92 62 51 66 82 117 127 142 152 142 152 1305
Forecast for production
(KWh/month/whole park)
112840 167440 112840 92820 120120 149240 212940 231140 258440 276640 258440 276640 2269540
Produced Energy
(KWh/month/whole park)
258008 201194 124459 95416 111385 135000 264699 255057 254919 335090 328270 312621 2676118
Income VAT (20%) Excluded 92224,96 71916,80 44487,87 34106,45 39814,57 48255,75 94616,66 91170,12 91120,80 119777,92 117340,11 111746,38 956578,38
Income VAT (20%) Included 110670 86300,15 53385,44 40927,74 47777,48 57906,9 113540 109404,15 109344,96 143733,5 140808,13 134095,65 1147894,05
1 Year Production and Income Statistics - September 2012 to August 2013
Sept.2012 Oct.2012 Nov.2012 Dec.2012 Jan.2013 Feb.2013 Mar.2013 Apr.2013 May2013 June2013 July 2013 Aug.2013 Total
Forecast for production
(KWh/month/1MWp)
120 92 62 51 66 82 117 127 142 152 142 152 1305
Forecast for production
(KWh/month/whole park)
112840 167440 112840 92820 120120 149240 212940 231140 258440 276640 258440 276640 2269540
Produced Energy
(KWh/month/whole park)
265666 200105 80117 86149 96998 72097 170122 246848 1218102
Income VAT (20%) Excluded 94962,31 71527,53 28637,82 30793,96 34671,94 25771,07 60810,1089 88235,8176 435410,5599
Income VAT (20%) Included 113954,77 85833,04 34365,39 36952,75 41606,32 30925,29 72972,13068 105882,98112 522492,67188
* All forecast data are from the Pre-Planning Report of Grid-connected PV Installation prepared by our reported Consultants
2. Expenses:
Average Annual O&M Expenses EUR/kWh 0,013
Insurance   ALLIANZ
N.B. Average Annual O&M Expenses as determined by the State Energy and Water Regulatory Commission.
3. Corporate Tax: % 10
4. Depreciation:
The useful life of the equipment is assumed to be 25 years and the Depreciation Plan for the assets could be freely accommodated within the time range
10 – 25 years as per investor's requirements.

TECHNICAL EQUIPMENT PROVIDER
Mitsubishi International Corporation

PV Module Type - CSUN 230-60P, produced by CEEG Nanjing Renewable Co. Ltd. (www.ceeg.cn/pv).

Inverter - String Inverters Sunny Tripower 15000TL/17000TL, produced by SMA Solar Technology AG (www.sma.de).

Support Structure – Fixed Type – produced by ATARO KLIMA Plovdiv (www.ataro.bg).

Project Financing - Under a long term bank loan facility.